Preparations are running

The new building of UFG Umformtechnik GmbH is in full swing. Here you will soon receive more information.

We will also keep you up to date with impressions of the current construction measures.

property mowing

July 2019

Mowing the area

A new building of UFG Umformtechnik GmbH will soon be located here. Be curious, we will keep you up to date on the subject of new construction.

UFG New building, production of the subgrade

August 2019

Production of the subgrade

Now it already looks like a construction site…

Excavators and bulldozers start the production of the subgrade.

It goes forward!

View from above

August 2019

view from above

From the bird’s eye view: In the most beautiful summer weather we are working hard on our new property… and week after week we are getting closer and closer to the actual start of construction.

calm before the storm

August 2019

rest before the storm

Time to take a deep breath…

Now the floor is ready for the next construction phase. Let’s go!

Limestone layer

August 2019

The lime layer

For optimal stabilization, a layer of lime is milled 40 cm deep into the ground and then smoothed.

This soil-lime mixture results in a solid base for our new production hall.

Panorama

September 2019

All around

Flagpoles

Everything was thought of during the construction planning. Even the construction of the parking areas and the raising of the flagpoles are already in full swing.

Foundation, UFG Umformtechnik GmbH, new building

October 2019

The foundation

UFG Umformtechnik GmbH, New Building, FoundationFundamentFoundation new building
A lot has happened in the last weeks.

We have used the beautiful weather of the summer to prepare the ground for the start of construction of the production and administration building.

For a stable foundation, reinforcing steel cages

The construction of the hall begins

With a little delay, the next construction phase now begins – the building of the hall.

In the next few days, the steel construction, consisting of 80 tons of steel,

Built up step by step and welded to the foundation anchor plates.

Foundation new buildingNew building UFG the foundationThe structure, UFG New building, UFG Umformtechnik GmbH New building, construction, UFG Gotha

The sandwich elements are now installed as the outer facade.

January 2019

The outer facade

External facade, sandwich elements, UFG Umformtechnik GmbH, new building, External facade

The sandwich elements are now being installed as the external facade.

The false ceiling has started to be installed.

January 2019

The false ceiling

<False ceiling, UFG Umformtechnik GmbH, new building

Work has begun on the false ceiling.

exterior facade

February 2020

The outer facade

The exterior facade has been completed with the sandwich elements and the large rolling gate has also been installed. IMG_5634

The outer facade was finished with the sandwich elements and the large rolling gate is also already installed.

False ceiling as additional storage space IMG_5706

February 2020

suspended ceiling as additional storage space

A false ceiling was installed as additional storage space.

A suspended ceiling was installed as additional storage space. IMG_5716False ceiling IMG_5704

Ceiling Cranes

February 2020

The 4 new overhead cranes

Our 4 new overhead cranes for the production area were installed.

Production CranesOur 4 new overhead cranes for the production area have been installed.

exterior facade

March 2020

The outer facade

<The exterior facade was completed with the sandwich elements and the large rolling gate has also been installed. IMG_5634

The outer facade and the roof are almost finished.

Interior fittings

March 2020

The interior fittings

The interior work is running at full speed!

The floor is now optimally prepared for further processing.

The underfloor heating has already been laid and then the concrete core activation was installed.

Der Aufbau, UFG Neubau, UFG Umformtechnik GmbH Neubau, Aufbau, UFG GothaNew building, construction, UFG GothaNew building, construction, UFG GothaNew building, construction, UFG GothaNew building, construction, UFG Gotha

The media pit was completed

May 2019

The media pit is ready!

The media pit was completed.

Dry construction in the administrative section

May 2020

dry construction in the administration section

The drywall construction in the administration section is running at full speed!

The drywall construction in the administration section is running at full speed

Installation of the photovoltaic system

May & June 2020

Assembly of the photovoltaic system

The company maxx solar & energie from Waltershausen started the installation of the photovoltaic system this week. (May 2020)

The assembly of the photovoltaic system is now also completed. (June 2020)

Firma maxx solar & energie aus Waltershausen Installation of the photovoltaic system The installation of the photovoltaic system is complete.

]

Cladding sheets were completely mounted on the base

May 2020

The cladding sheets are now complete

The cladding sheets were completely mounted on the base and the paving of the driveway was started.

Cladding new building UfG Gotha cladding sheetsPaving the driveway

The paving work in front of the hall has now been completed.

June 2020

The paving work in front of the hall has now been completed.

Now the paving work in front of the hall has also been completed.

Pavement work in front of the hall | new building | UFG Umformtechnik GmbH

Partition walls have been erected, underfloor heating in the administration part is finished and long cables have been laid.

June 2020

A lot has happened inside too.

The partition walls were erected.

Meters of cable were laid.

And the underfloor heating in the administration part is also finished.

Floor heating in the administration part is now ready!A lot has happened inside. | Neubau | UFG Umformtechnik GmbHA lot has happened inside too, partitions.Cables were laid | New Building | UFG Umformtechnik GmbH

View of our new object from above.

July 2020

The view from above

View of our new object from above.

Tanks for oxygen and nitrogen

July 2020

Tanks for oxygen and nitrogen

<The two tanks for oxygen and nitrogen were erected and connected.

The two tanks for oxygen and nitrogen were installed and connected.

Ceiling Cranes

July 2020

Outdoor advertising – new building UFG-Gotha

Our outdoor advertising was placed. Now we are no longer to be overlooked.

Outdoor advertising UFG-GothaThe outdoor advertising of the new building of UFG-Gotha

Haben Sie Fragen?

Rufen Sie uns an oder schreiben Sie uns eine E-Mail. 

Wir beraten Sie gerne.

Ansprechpartner

Alexander Steiger
– Geschäftsführer –
Telefon: 03621 42960960
E-Mail: firma@ufg-gotha.de

Kundenmeinungen:

"Wirklich Klasse Unternehmen. Wir sind vollkommen zufrieden mit den bisherigen Arbeiten. Ein sehr kompetentes zuverlässiges Team."

Marco Schütze | Portal-Berwertungen

UFG
2020-04-17T17:02:40+02:00

Marco Schütze | Portal-Berwertungen

"Wirklich Klasse Unternehmen. Wir sind vollkommen zufrieden mit den bisherigen Arbeiten. Ein sehr kompetentes zuverlässiges Team."
"Alle meine Aufträge wurden sehr schnell verwirklicht und die Qualität stimmt auch."

Wilfried Kahle | Google Bewertungen

UFG
2020-04-17T17:04:06+02:00

Wilfried Kahle | Google Bewertungen

"Alle meine Aufträge wurden sehr schnell verwirklicht und die Qualität stimmt auch."
0
0
UFG